fb icon

fb icon
Follow E-tek on fb!

February 21, 2016

International Harvester 120 Series: Box floor

 The prep time in order to get the box floor into the shape required to be welded to the outer structure is significant - and today was devoted to the things no-one ever sees. Measure - edges trimmed, floor shaved, box sides prepped, fitment. Measure again.  Welding coming next.



www.E-tekRestorations.blogspot.com